Data Center Equipment Retirement and Waste Services

Plan a data center cleanout around asset ownership, data requirements, UPS battery inventory and the facility’s release window. Identify which equipment will be disconnected and ready for collection.

Build the handoff around the asset list

Servers, storage and network equipment

Separate data-bearing assets from racks, rails, switches and peripherals. Send counts and a sample of the asset fields you track. State whether you need serial-level reconciliation, a documented handoff or an agreed data destruction record.

UPS equipment and batteries

List UPS units and battery cabinets separately. Include known battery chemistry, counts, condition, configuration and location. Identify who will isolate or disconnect equipment. Battery acceptance and any electrical work require separate confirmation.

Access and release windows

Describe the route from the equipment room to the dock, including elevator limits, staging space, escorts and maintenance windows. Identify the asset owner or tenant authorized to release each batch.

Can one pickup cover a phased rack retirement?

Start with the first released batch and the expected dates for later batches. A tenant may release servers before the facility releases racks or UPS equipment. Agree which asset IDs belong to each pickup and which records the owner needs afterward. Flag installed fire-suppression equipment separately so the team can review whether that work is available.